Managed Proxmox Physical-Server Prerequisites
Dedicated hardware, facility, access, and provider inputs needed before onboarding
Physical-server prerequisites
Managed Proxmox depends on the physical environment being operable. Before Assistance builds or takes over a cluster, the customer and Assistance must confirm the hardware, facility, provider, connectivity, and access assumptions that define the operating boundary.
Required decisions before build or takeover#
Hardware baseline#
The exact bill of materials is scoped per workload, but the assessment should capture:
- CPU model, core count, virtualization extensions, and expected consolidation ratio;
- memory capacity, growth plan, and per-workload reservation assumptions;
- boot disks, VM/storage disks, controller mode, firmware level, disk health, and hot-spare strategy;
- NIC count, speed, bonding options, management network, public/private separation, and VLAN support;
- vendor warranty, replacement lead time, spare availability, and provider hands-on support process;
- hardware age, firmware update history, BIOS settings, and known component alerts.
For production or business-critical workloads, single-host designs should be treated as a conscious risk decision. Clustering, redundant networking, redundant storage, and tested backups reduce risk but do not remove the need for application-level recovery validation.
Access prerequisites#
Assistance needs enough access to operate the agreed boundary and no more:
Acceptance gate#
Before production workloads move onto Managed Proxmox, record evidence for:
- host inventory and serial/provider details;
- network diagram or written topology;
- storage layout and usable-capacity estimate;
- management and emergency-access path;
- backup target and first successful backup;
- monitoring and alert route;
- customer owner for application validation;
- planned maintenance window and support channel;
- known risks accepted by the customer.
Facility and provider ownership must be explicit
If the customer owns the colocation, hosting provider, power, network circuit, or warranty relationship, Assistance can coordinate and advise, but provider contracts and business approvals remain with the customer unless the engagement explicitly says otherwise.